Wind Farm Shut Down Again After Blade Breaks Off Siemens Gamesa 4.x Turbine



Wind Power News 12:22 pm on April 12, 2024


A wind farm in Norway has been shut down after a blade broke off a Siemens Gamesa 4.X turbine, marking another halt for the project. This incident follows a previous blade failure at the same site in August last year. (Orlando Jenkinson, Windpower Monthly)

  • A wind farm in Norway has been shut down due to a blade breaking off a Siemens Gamesa 4.X turbine
  • This is the second blade failure at the same site within a year, following an incident in August 2021
  • The project was previously operational but has now been halted due to safety concerns
  • Siemens Gamesa is the turbine manufacturer involved
  • No further information regarding the cause of the blade failure or the extent of the downtime has been provided

https://www.windpowermonthly.com/article/1868618/wind-farm-shut-down-again-blade-breaks-off-siemens-gamesa-4x-turbine

< Previous Story     -     Next Story >

Copy and Copyright Pubcon Inc.
1996-2024 all rights reserved. Privacy Policy.
All trademarks and copyrights held by respective owners.